CONSTRUCTION

ANKARA-İSTANBUL FAST TRAIN 2ND PHASE SECTION 2

  • ...
  • ...
  • ...
  • ...
  • ...
  • ...
  • ...
  • ...
  • ...
  • ...

ANKARA-İSTANBUL FAST TRAIN PROJECT 2ND PHASE SECTION 2

Employer: State Railways of Republic of Turkey

Contract Date: Jul 2006

Termination Date: Jul 2014

Section II 

Vezirhan (excluded)- İnönü (excluded) (54 KM) 250 km/s suitable for design speed:
- railway infrastructure works: (excavation, filling, bored tunnel, cut-and-cover tunnel, viaduct, bridge, underpass and overpass, agricultural underpass and vents, existing infrastructure transfers)
- railway superstructure works: construction and operation of line superstructure (existing railway displacement works such as ballast, sleeper, rail, junction, etc.)
- electrification works
-signalization works
- telecommunication works

 