CONSTRUCTION

ANKARA-İSTANBUL FAST TRAIN 2ND PHASE SECTION 1

  • ...
  • ...
  • ...
  • ...
  • ...
  • ...
  • ...
  • ...
  • ...
  • ...
  • ...

ANKARA-İSTANBUL FAST TRAIN PROJECT 2ND PHASE SECTION 1

Employer: State Railways of Republic of Turke

Contract Date: Nov 2006

Termination Date: Jul 2014

Project Place                : Ankara-İstanbul, Türkiye

Köseköy(excluded) – Vezirhan(included) (104 KM) suitable to 250 km/s design speed:
- railway infrastructure works: (excavation, filling, bored tunnel, cut-and-cover tunnel, viaduct, bridge, underpass and overpass, agricultural underpass and vents, existing infrastructure transfers)
- railway superstructure works: construction and operation of line superstructure (existing railway displacement works such as ballast, sleeper, rail, junction, etc.)
- electrification works
-signalization works
- telecommunication works

 

OTHER PROJECTS